WQ99947 (e) Wedi’i gyflwyno ar 05/08/2026

Ymhellach i WQ99485, faint o gyfleusterau yng Nghymru y caniateir iddynt dderbyn gwastraff asbestos o waith datgomisiynu tyrbinau gwynt a pha asesiad sydd wedi'i wneud ynghylch a oes digon o gapasiti gwaredu ar gyfer tyrbinau sy'n cyrraedd diwedd eu hoes dros y degawd nesaf, ac, os nad oes asesiad, a wnaiff Llywodraeth Cymru gomisiynu a chyhoeddi un?

Wedi'i ateb gan Gweinidog Cabinet dros Addysg a’r Gymraeg | Wedi'i ateb ar 13/08/2026

The precise number of sites permitted to accept asbestos waste can change over time as permits are issued, varied, or surrendered, and the most up to date information is held by NRW.

The Welsh Government has not undertaken a Wales-specific assessment of future disposal capacity for asbestos waste arising from wind turbine decommissioning over the next decade and have no plans to commission one. Current arrangements are based on the regulatory framework operated by NRW, which monitors waste management capacity and infrastructure requirements across Wales. As the volume of wind energy infrastructure approaching end of life increases, we will continue to work with NRW, industry and other stakeholders to monitor waste management needs, including those associated with hazardous materials.