WQ96319 (e) Wedi’i gyflwyno ar 28/04/2025

A wnaiff yr Ysgrifennydd Cabinet gadarnhau a oedd arolwg wedi'i gwblhau ar bont groesffordd Caerdydd cyn i'r berchnogaeth gael ei throsglwyddo o Network Rail i Trafnidiaeth Cymru, ac os felly, a nodwyd unrhyw broblemau?

Wedi'i ateb gan Ysgrifennydd y Cabinet dros Drafnidiaeth a Gogledd Cymru | Wedi'i ateb ar 02/05/2025

The last detailed examination of the structure before divestment was undertaken in July 2019. Transport for Wales are currently reviewing this report as part of their ongoing investigation into the incident.