WAQ71325 (e) Wedi’i gyflwyno ar 24/10/2016

Yn ystod y cyfnod pan oedd Cyffordd 41 yr M4 ar gau, pa wybodaeth am y defnydd o'r ffordd ddosbarthu ymylol ym Mhort Talbot a gafodd Llywodraeth Cymru?

Wedi'i ateb gan Ysgrifennydd y Cabinet dros yr Economi a'r Seilwaith | Wedi'i ateb ar 01/11/2016

The evaluation report into the trial closure provides the data and analysis requested. The report is available at the following link:

http://gov.wales/docs/det/report/150608-m4j41-trial-closure-evaluation-en.pdf