WQ83293 (e) Wedi’i gyflwyno ar 01/09/2021

Pa ganran o rwydwaith ffyrdd Cymru fydd yn dod o fewn y terfyn cyflymder arfaethedig o 20mya?

Wedi'i ateb gan Y Dirprwy Weinidog Newid Hinsawdd | Wedi'i ateb ar 09/09/2021

There are a total of 34,850km of public road in Wales. In terms of the 20mph project, it is anticipated:

  • 60% will be out of scope as it has a speed limit of 40mph or above.
  • 35% will automatically change from 30mph to 20mph (existing 30mph, not A or B classified).
  • 5% will be reviewed through an exception process (existing 30mph, A or B classified), of which a small proportion would be expected to be classed as an exception to remain at 30mph. The majority will become 20mph.
  • <1% is already 20mph

It is anticipated, the changes will therefore affect close to 40% of the total length of Wales road network.