WAQ75475 (e) Wedi’i gyflwyno ar 22/01/2018

Pa gynnydd a wnaed yn y gwaith o gynnal asesiad gweithredol o gylchfan McDonald's ar yr A4042 ym Mhontypwl?

Wedi'i ateb gan Ysgrifennydd y Cabinet dros yr Economi a Thrafnidiaeth | Wedi'i ateb ar 25/01/2018

A4042/A472 Heron Roundabout Study – Officials have recently commissioned a Stage 1 WelTAG Assessment of potential options to improve the operation and safety of the roundabout. The assessment is likely to be completed in spring and will include liaison with Torfaen County Borough Council, as the Highway Authority for the A472. Depending on the outcomes, Stage 2 and 3 WelTAG Assessments will possibly be commissioned to help determine which of the options should be taken forward to design development and construction.

 

A4042 Route-based Local Safety Scheme – Detailed design of the recommendations from the Route-based Collision Investigation and Prevention (CIP) Study was completed in 2017. The improvement measures are programmed to be implemented in the current financial year.

 

I can also confirm that improvement works at the A4042 Cwmbran ‘Rechem’ Roundabout, associated with the South Sebastopol development, started in the New Year, and that improvement measures, associated with the Specialist and Critical Care Centre development, are due to be made to the A4042 Llanfrechfa ‘Turnpike’ roundabout later this year.